Bridge Construction - RiverLink
A state-of-the-art steel bridge designed to enhance connectivity between urban and rural areas, ensuring durability and minimal environmental impact.
Location: RiverLink Valley, spanning 3.5 kilometers.
Steel Used: 20,000 metric tons of corrosion-resistant alloy.
Status: 80% completed, expected to open by Q4 2025.
High-Rise Building Framework - SkyTower
The structural steel framework for a 75-story skyscraper, blending innovation and safety to set new benchmarks in urban construction.
Location: Downtown Metropolis.
Steel Used: 50,000 metric tons of high-strength structural steel.
Status: Structural framework completed; finishing work in progress.
Industrial Plant Expansion - SteelWorks 4.0
Expanding our production capacity with a cutting-edge steel manufacturing plant equipped with Industry 4.0 technology.
Location: Industrial Hub, Steel City.
Capacity: 1.5 million metric tons annually.
Status: Construction in progress, operational by 2026.